CSSi does the onsite sewage, stormwater management, and drainage work for subdivisions. We do the required investigative work and then design a system and prepare drawings in support of a subdivision application.
The onsite sewage system design is submitted to the Vancouver Island Health Authority. The health authority has guidelines for onsite sewage systems and subdivisions. These are very different than the requirements for a sewage system that is for a property that is not being subdivided.
Once the subdivision is approved, we can also install the approved works for your new subdivision.
If you are wanting to subdivide a property into two or more lots, please call Kelly at 250-478-1158 to discuss your subdivision plans.
CSSi can also help you re-zone a property (remove it from the Agriculture Land Reserve)